Chrome Moly Steel 16Mo3 Material, 16Mo3 Elbow, 16Mo3 Fittings Manufacturers In India.

  • 16Mo3 Fittings Manufacturers

16Mo3 TC1 Steel Fittings, Chrome Moly Steel 16Mo3 TC2 Fittings, 16Mo3 Fittings Suppliers.

Standard Specifications For 16Mo3 Fittings

Size 1/2" to 48" Seamless/Buttweld Fittings
Qualification ISO
Outside Diameter Seamless/ Buttweld Fitting ( 1/2″~48″), ERW / Welded / Fabricated Buttweld Fitting (1/2″~48″)
Type Seamless and Welded
Wall Thickness 3mm – 40mm / SCH5, SCH10, SCH20, SCH30, SCH40, STD, SCH80, XS, SCH60, SCH80, SCH120, SCH140, SCH160, XXS
Value Added Services Hot Dipped Galvanizing, Epoxy & FBE Coating, Electro Polish, Sand Blasting, Threading, Soldering
Thickness SCH10,SCH20,SCH30,STD SCH40, SCH60, XS, SCH80., SCH100, SCH120, SCH140, SCH160, XXS
Material 16Mo3

Mechanical Properties for 16Mo3 steel:

 Grade/test 16Mo3
Tensile Strength (MPa) 440 – 590
Yield Strength (MPa) 220 – 275
Elongation in 100 – 150mm (%) 19
Elongation in 16mm (%) 24
Max Thickness (mm) 250

Chemical Properties for 16Mo3 steel:

Elements Composition (%)
Carbon (C) (Max) 0.12 – 0.2
Manganese (Mn) 0.4 – 0.9
Silicon (Si) 0.35
Phosphorous (P) 0.025
Sulphur (S) 0.01
Chromium (Cr) 0.3
Molybdenum 0.25 – 0.35
Nickel (Ni) 0.3
Copper (Cu) 0.3
Nitrogen (N) 0.0120
16Mo3 Fittings Application Industries
  • Food processing equipment
  • Equipment and appliances
  • Architectural railings
  • Pharmaceutical and chemical process equipment
  • Heat exchangers
  • Threaded fasteners
  • Springs
  • Industrial fabrications
Properties of 16Mo3 Fittings
  • Excellent corrosion resistance in a wide range of atmospheric environments
  • Good oxidation resistance in intermittent service to 870°C and in continuous service to 925°C
  • Good resistance to carbide precipitation
  • Good machining properties
  • Chrome Moly Steel offers higher strength at elevated temperatures
  • Excellent weldability with and without filler metals
16Mo3 Fittings Delivery Time
  • Malaysia = 15 to 18 Days
  • Indonesia = 20 to 25 Days
  • UK = 30 to 40 Days
  • Thailand = 15 to 20 Days
  • US = 40 to 60 Days
  • Germany = 30 to 40 Days
  • Philippines = 30 to 40 Days
  • For All Gulf Countries = 10 to 15 Days
  • For All European Countries = 30 to 40 Days
Our Global Market